Redevelopment of Hotel Kempinski Palace Engelberg
Un aspect important pour le maître d'ouvrage était d'allier l'ancien et le nouveau. An important aspect for the client was to combine the old and the new. The seamless integration of Belle Époque charm with modernity has been executed brilliantly. We we were delighted to contribute to the metamorphosis of the Grand Old Lady in the lift area with our metal sheeting with Steel Color S.P.A. finishes.
:strip_icc():strip_exif()/cms/blog/Referenzen/kempinski/contentblog-kempinski-01.jpg)
The cabin doors, door frames and the panel were covered with "Steel Color" sheeting by the lift manufacturer. The remaining components of the lift system were manufactured by the company KDS AG.
:strip_icc():strip_exif()/cms/blog/Referenzen/kempinski/contentblog-kempinski-02.jpg)
Property
Kempinski Palace Engelberg
Project data
Elevator systems, modernization of old and new buildings
Planning & realisation
Properties
Stainless steel sheets
Material 1.4301 / 07
Thickness 0.8 mm
:strip_icc():strip_exif()/cms/contact/content/steelcolor/steelcolor-watermark.png)
Are you interested in finding out more about these extraordinary surface finishes?
What do you need to consider in the planning and how can the sheets be processed?
Our experienced team will be happy to advise you.